Plain definitions for the vocabulary this category keeps inventing. Where a term is genuinely useful we say so, and where it is repackaging we say that too.

Terms

The vocabulary

Async stand-up
A daily status ritual answered in writing inside a window rather than in a synchronous call. Useful when a team spans more than about four hours of time-zone spread.
Blocker ageing
Tracking how long an item has been blocked, so that a two-day blocker and a two-week blocker stop looking identical in a list.
Scope drift
Work added to a sprint after kickoff. Distinct from velocity drift, which is the same scope moving more slowly.
Capacity heatmap
A view of committed work per person per day, with time-off applied. Exists to find overload, not to rank people.
Decision Record
A short structured note capturing a decision, its owner, its date and the alternatives considered. Borrowed from the ADR practice and applied beyond architecture.
Forecast accuracy
How close the sprint completion probability was to the actual outcome, measured after the fact. A forecast nobody scores is a guess with a progress bar.
North-star metric
The single measure a team optimises. Ours is time saved per builder per week. Most companies have four, which means they have none.
Sync by exception
Meeting synchronously only when the conversation genuinely requires presence, rather than as a recurring calendar habit.